论文标题
通过网格形成电池将黑色起始功能整合到离岸风电场
Integrating Black Start Capabilities into Offshore Wind Farms by Grid-Forming Batteries
论文作者
论文摘要
电力系统目前正在通过大规模的可再生能源部署进行电力生成的过渡。这些正在逐渐取代传统的热电厂,如今,这是黑人起步(BS)服务的主要提供商。因此,如果完全/部分停电,传统的黑色启动资源还没有准备好进行操作。近海风电场(OWFS)具有较大的容量和快速控制器,具有新型BS单元的潜力。这项新服务引入了对风能系统的新设计,以便能够满足非传统发电单元的黑色起始需求。在本文中,将提出将BS服务集成到OWF中的挑战和可能的解决方案。第一个挑战是实施BS单位。 BS单元应首先形成风电源岛,并因能量引起的瞬时现象。可能会有几种不同的解决方案,例如,在风电场设计中将网格形成转换器的集成可能是电池储能系统(BESSS)。在本文中,使用配备有网格贝丝的风电场上的模拟对特定的挑战进行了分析,并讨论了拟议的解决方案。可以得出结论,由BES和OWF组成的混合系统结合了新技术,例如形成网格的控制,软充电等,代表了能够向OWF提供BS服务的可行建议。
Power systems are currently experiencing a transition towards decarbonisation of electrical generation through large-scale deployment of renewable energy sources. These are gradually replacing conventional thermal power plants which today are the main providers of black start (BS) services. Consequently, in case of a total/partial blackout, conventional black-start resources are not ready for operation. Offshore wind farms (OWFs), with their large capacity and fast controllers, have potential as novel BS units. This new service introduces a need for a new design for wind power systems to be able to fulfil the black start requirements for non-traditional generation units. In this paper, challenges, and possible solutions in integrating BS services into OWFs will be presented. A first challenge is represented by the implementation of a BS unit. The BS unit should be capable of firstly forming the wind farm power island and withstanding transient phenomena due to energisation. There could be several different solutions, e.g., the integration of grid-forming converters in the wind farm design which could be battery energy storage systems (BESSs). In this paper, specific challenges are analysed using simulations on a wind farm equipped with a grid-forming BESS, and the proposed solutions discussed. It can be concluded that a hybrid system comprised of a BESS and an OWF, in combination with novel technologies such as grid-forming control, soft-charging, etc. represents a feasible proposal for being able to provide BS services with OWFs.