LHC LS-2期间的CMS RPC活动
CMS RPC Activities During LHC LS-2
论文作者
论文摘要
对于CMS电阻板室(RPC),第二个LHC长时间关闭期(LS2)是完成其合并和升级项目的重要机会。合并包括对气体紧密度,HV(高压),LV(低压)和缓慢控制操作的检测器维护。 RPC 2阶段升级的所有服务,即RE3/1和RE4/1的所有服务,都可以安装到LS2。本文总结了RPC系统维护和升级活动。
The second LHC long shutdown period (LS2) is an important opportunity for the CMS Resistive Plate Chambers (RPC) to complete their consolidation and upgrade projects. The consolidation includes detector maintenance for gas tightness, HV (high voltage), LV (low voltage) and slow control operation. All services for the RPC Phase-2 upgrade, namely RE3/1 and RE4/1, were anticipated for installation to LS2. This paper summarises the RPC system maintenance and upgrade activities.